Overseas Mining Project: RUIXIN 14-Ton Underground Mining Dump Truck

1. Project Background

In September 2026, RUIXIN prepared one 14-ton underground mining dump truck together with supporting spare parts for an overseas mining customer.

The customer was looking for a suitable transport vehicle to handle the movement of ore, waste rock, and other bulk materials in underground mining operations. The equipment needed to provide sufficient loading capacity while matching the demands of repeated loading, transportation, and unloading cycles.

In addition to the truck, the customer also required spare parts to be prepared for future maintenance. For overseas mining projects, having the necessary parts available can help reduce concerns about equipment servicing and unexpected downtime.

Based on these requirements, RUIXIN arranged the equipment preparation, factory inspection, and supporting spare parts for the project.

2. Customer Requirements and Transportation Challenges

Underground mining transportation involves more than simply moving materials from one location to another. Equipment must operate under demanding working conditions and remain suitable for the mine’s transportation requirements.

The customer’s main considerations included:

  • Loading capacity: The truck needed a rated payload suitable for transporting bulk mining materials in regular haulage operations.

  • Cargo box structure: The cargo box needed to accommodate heavy materials and withstand repeated loading and unloading.

  • Power and braking: The vehicle required a diesel power system and a suitable braking configuration for underground transportation.

  • Maintenance preparation: Supporting spare parts were needed alongside the equipment to prepare for future servicing.

These requirements formed the basis for RUIXIN’s equipment configuration and delivery preparation.

3. RUIXIN’s Equipment Solution: 14-Ton Underground Mining Dump Truck

To meet the customer’s requirements, RUIXIN prepared a 14-ton diesel underground mining dump truck. The main configuration is shown below.

ItemSpecification
Equipment TypeUnderground Mining Dump Truck
Rated Payload14 tons
Cargo Box Volume6 m³
Engine Power118 kW (160 HP)
Fuel TypeDiesel
Braking SystemWet Brake
Tire Model900-20 Radial Tire
Cargo Box Bottom Plate10 mm
Cargo Box Side Plate5 mm

Matching the Configuration to Mining Requirements

Payload and Cargo Box Capacity

The rated payload of 14 tons and 6 m³ cargo box are intended for bulk material transportation. This configuration provides the customer with a defined loading capacity for underground ore and waste rock haulage.

Cargo Box Structure

The cargo box uses a 10 mm bottom plate and 5 mm side plates. These specifications define the structure selected for handling mining materials during regular loading and unloading operations.

Diesel Power and Braking Configuration

The 118 kW (160 HP) diesel engine provides the vehicle’s power, while the wet braking system forms part of its braking configuration. Together with the 900-20 radial tires, these components make up the main running configuration of the truck.

For more information about RUIXIN’s available underground mining dump trucks, buyers can review different equipment configurations according to payload, cargo box volume, and mine conditions.

4. Factory Inspection and Overseas Shipment Preparation

Before the equipment was prepared for overseas delivery, RUIXIN carried out factory inspection and functional checks to review the truck’s main systems.

The inspection process covered several key areas:

  • Chassis and frame: Checking the main structure and relevant connections.

  • Dumping system: Inspecting the cargo box and hydraulic lifting components.

  • Steering and braking: Checking the steering operation and braking system.

  • Power system: Reviewing the engine and related operating components.

  • Tires and electrical components: Checking tire condition, lighting, and electrical connections.

The truck’s basic functions were also checked before delivery preparation. In parallel, the supporting spare parts were organized and prepared for shipment with the equipment.

For underground dump trucks, regular inspection after delivery is equally important. RUIXIN has also published practical information about hydraulic hoisting system maintenance, covering hydraulic oil, hoses, cylinders, and other key components.

5. Project Results and Delivery Completion

In September 2026, RUIXIN completed the preparation of the 14-ton mining dump truck and its supporting spare parts for the overseas project.

The main delivery preparation results were:

One Truck Prepared

One 14-ton underground mining dump truck was prepared according to the project configuration.

Factory Inspection Completed

The main vehicle systems underwent factory inspection and functional checks before delivery preparation.

Supporting Spare Parts Prepared

The spare parts required for the project were organized alongside the truck, providing additional preparation for future maintenance.

Overseas Shipment Arranged

The equipment and supporting parts were prepared for overseas shipment as part of the project delivery process.

Project ItemResult
EquipmentUnderground Mining Dump Truck
Quantity1 Unit
Rated Payload14 Tons
Factory InspectionCompleted
Functional ChecksCompleted
Supporting Spare PartsPrepared
Preparation TimeSeptember 2026

Actual operating results, including daily hauling capacity, fuel consumption, and equipment availability, will depend on the mine layout, material conditions, transportation distance, and operating practices after commissioning.

6. Conclusion

This overseas project reflects RUIXIN’s experience in preparing underground mining dump trucks for customers with specific material transportation and maintenance requirements.

From equipment configuration and factory inspection to supporting spare parts preparation, each step was arranged around the customer’s project needs.

For mining operators planning to upgrade their underground haulage equipment, selecting a suitable truck and preparing for future maintenance are both important parts of project planning.

Explore more RUIXIN underground mining equipment or contact our team to discuss your mining transportation requirements.

Related Products

Technical Review: RUIXIN EQUIPMENT Engineering Team
Published: November 23, 2026
Last Updated: November 23, 2026

If you want to learn more about our other products, click the link below to visit our official website.

Our other websites

Drilling rig
lithium battery
Air loaders
Mucking loaders
MiningElectric Locomotive (comprehensive website)
MiningElectric Locomotive (comprehensive website)
MiningElectric Locomotive (comprehensive website)

Follow Us

Please follow our YouTube channel

en_USEnglish